Coast Guard National MACC

 

Job Description

Bid Date

Point of Contact

Drawings / Specs

Amendments

Boat Maintenance Annex
Cleveland Harbor Moorings
02/20/12 Hugh Williams:  Estimator
Hugh.Williams@TetraTechTesoro.com

(757)518-8491 Ext. 226 - Phone
(757)-518-8417 - Fax

RFP
Bid Form
Wage Rates
Specifications
Appendix A:  Drawings  
CAD Files
Appendix B:  Geotechnical Report
Appendix C:  Lab Report
Appendix D:  FF&E
Appendix E:  Space Criteria Sheets
Site Visit Pictures
Site Visit Pictures (Top of Building)

01

02

03
Drawings

Construct New ESD/CIVPERS
Building #62
Elizabeth City, NC

 
02/14/12 Eddie Crank:  Estimator
Eddie.Crank@TetraTechTesoro.com
 
(757) 518-8491 Ext. 224-  Phone
(757) 518-8417 - Fax

RFP
Bid Form
Wage Rates - Revised by Amendment 2
Specifications
Drawings

Reference Drawings
Thrun Hall Drawings
Environmental
13.2 KV Conversion
Parking Apron for C130J
DES-REQs
Data in Existing Lift Station
Hydrant Flow Test 10/20
TM5-803-5 Installation Design

01
Revised Drawings
CAD Files

02 

03

04

 
Design & Construct Deepwater Engineering and Weapons Training Building, Phase 1
Yorktown,  VA
02/05/2012
C.O.B
Vic Lopez:  Estimator
Vic.Lopez@TetraTechTesoro.com 

 
(757) 518-8491 Ext. 224-  Phone
(757) 518-8417 - Fax

RFP
Wage Rates - Revised by Amendment 7
Bid Form
Specifications
Space Criteria Sheets
Drawings
Basic Facility Requirements
Utility Plans
Stormwater Information
Geotech Attachments

01
02
C102
03
Drawings
04
NEPA
Odyssey Battery
Photos
Installation Design Guide
Yorktown VNG Invoice & Dominion Power Schedule
Adira Waterline Construction Drawings
Space Criteria Sheet
05
06
07
08
Homeporting
Fast Response Cutters (FRC)
San Juan, Puerto Rico
10/03/11 Tom Saunders:  Estimator
Tom.Saunders@TetraTechTesoro.com
 
 
(757) 518-8491 Ext. 221 -  Phone
(757) 518-8417 - Fax

RFP
General Requirements
Bid Form
Specifications
Drawings  
Drawings C002 - Linked Photos - Please note that picture #7 does not exist on drawing, so after #6 subtract 1 from drawing number to get the correct picture number in the pdf.

Site Visit Pictures

Reference Documents
A - Shore Ties Power Transformer
B - Site Utilities Plan
C - Waterfront Improvements
D - Electrical Shoreties Upgrade
E - Renovation of Operations Bldg. VES Bldg.
F - Inspect Electrical Distribution System
G - Replace Substation #3
H - Alpha Pier Structural Repairs
I - Base Utility System Maps
  - Sewer Line Map
  - Water Distribution System Map  
J - New Fuel Farm Draft
K - Free Dispenser Addition
L - FDCC Appendix L
M - FDCC Appendix M
N - Leak Testing Report
O - Waterfront Report
P - Telecommunications Exterior Ship Shore Tie Drawing
Q - DLO Cable Termination Details
R - FRC Requirements Summary Sheet
S - Water, Sewer, & Compressed Air
T - Electrical Shore Ties
U - Main LIft Station Pump
V - List of Compatible Electric Meters
W - Grove Crane Information Brochure
X - Typical Shore Power Enclosure
Y - Typical Marine Power Pedestal
Z - Marine Travel Lift

01
02
03
04 
05
06
07

Home  Up