Coast Guard National MACC

 

Job Description

Date Awarded

Contact Information For Job

Drawings / Specs

Amendments

Construct Mid-Life Renovations to Chase Hall Barracks Phase 3
New London, CT
07/29/11 Yamilet Gonzalez:  Project Manager
Yamilet.Gonzalez@TetraTechTesoro.com
  (757) 518-8491 Ext. 117 -  Phone
(757) 518-8589- Fax

RFP
Wage Rates
Specifications

Drawings

General
Civil
Architectural
Mechanical
Electrical

Site Visit Pictures 1
Site Visit Pictures 2
Site Visit Pictures 3
Site Visit Pictures 4


Reference Documents
Chase "B" Points on TFX Panes
Infiltration Study at Academy Chiller Plant
Geotechnical Report Chiller Plant
Air Quality Testing Report
 

01
02
03
04
05
06
Phase 2 Mechanical Drawings
07

Relocate Paint Complex to Building 78
Baltimore, MD
08/24/10 Nathan Leonard:  Estimator
Nathan.Leonard@TetraTechTesoro.com
(757) 518-8491 Ext. 211- Phone
(757) 518-8417 - Fax

RFP - Revised Entirely in Amendment 01
SOW
Wage Rates
RFI Form

Drawings
General
Site Survey
Civil
Architectural - Revised A-100, A-101, and A-102
Structural
Mechanical
Electrical
 

01

02

03

04

Consolidated
Pre-Bid RFI Q&A’s

Off Cycle Crew Support Building BSU
Alameda, CA
02/06/11 Neal Hasweh:  Project Manager
Neal.Hasweh@TetraTechTesoro.com 
  (757) 518-8491 Ext. 213 -  Phone
(757) 518-8589- Fax

General Requirements
Bid Form
Wage Rates
Specifications
Photos of Existing Project Site
Concept Design Site & Building Drawings
Hart Crowser Prelim Geotechnical Report
Appendix C of a Limited Envior. Site Investigation
NEPA Categorical Exclusion Determination
Sample Standard Operating Procedures (SOP) 
SAM Operational Level Process Guide
Original Construction Drawings for the Existing Concrete Slab
Site Visit Pictures
 

01
02
03
04 
05
06  
07
08
 


 

      Home  Up