Large MACC

 

Job Description

Bid Date

Point of Contact

Drawings / Specs

Amendments

Child Development Center Addition/Alteration 

Walter Reed National Military Medical Center Bethesda, MD

02/29/12

Tom Saunders:  Estimator
Tom.Saunders@TetraTechTesoro.com
  
 (757) 518-8491 Ext. 221 -  Phone
(757) 518-8417 - Fax

RFP
Bid Form
Wage Rates

Part 1
- Proposal Forms & Documents
Part 2 - General Requirements
Part 3 - Project Program
Part 4 - Performance Technical Specifications
Part 5 - Prescriptive Specifications

Part 6
Table of Contents
General
Architectural
Interior
Civil
Fire Protection
Landscape
Miscellaneous
6B - Reference Drawings 1
6C - Reference Drawings 2
6D - Reference Drawings 3

01

P561 Aircraft Prototype Facility Phase 2
NAS Patuxent River, MD

11/29/11

Tom Saunders:  Estimator
Tom.Saunders@TetraTechTesoro.com
  
 (757) 518-8491 Ext. 221 -  Phone
(757) 518-8417 - Fax

RFP
Bid Form
Wage Rates

Part 1 - Proposal Forms & Documents
Part 2 - General Requirements
Part 3 - Project Program
Part 4 - Performance Technical Specifications
Part 5 - Prescriptive Specifications

Part 6
Table of Contents
1. Concept Design Drawings
2. Topographic Survey
3. Geotechnical Report
Appendix A
4. Stormwater Management Existing Conditions Survey and Assessment
5. Environmental Assessment Report
6. NEPA Review
7. Installation Appearance Plan (IAP)
8. Performance Assessment Plan
9. Permits Record of Decision (PROD)
10. Best Value Determination Guidelines (Encl. 1)
11. Best Value Determination Guidelines (Encl. 2)

12. BPA Furniture Vendor Listing
13. Furniture Procurement Data Sheet
14. Furniture Procurement Data Sheet (continued)

15. Contractor Base Access Request Form
16. Operation and Maintenance Support Information (OMSI) - Scope of work
17. Fire Pump Performance/Acceptance Test Sheet
18. Geographic Information System (GIS) Deliverables - Scope of Work
19. Utility Connection Permit Application
20. PAX Cable Plant Labeling Requirements (01 Jan 2011)
21. PAX ISP / OSP Wiring Requirements (Revision 7)
22. Building Communication Room Specifications (Revision 7)
23. Equipment Inventory List Form
24. Project Sign Details
25. Preliminary LEED Checklist
26. Geothermal Well Test Data
27. Standard Inspection Form - General Permit for Stormwater Associated with Construction Activity
28. Hydraulic Calculations
29. Patuxent River Utility SOP and Water Meter Specifications
30. Price Schedule Items
01
02
03  
04
05
Pictures
06

      
Home Up