Coast Guard
 

Job Description

Date Awarded

Point of Contact

Drawings / Specs

Amendments

MPA Flight Training Systems Building

Mobile, AL

08/08/08 Craig Mckown:  Project Manager
mckownc@tesorocorp.com
(757)-518-8491 Fax
(757)-518-8491 Phone
RFP
General Requirements
Wage Rate
Space Criteria Sheets
Specifications
Drawings
Final Drawings
01 02  Drawings Water Tower Photo
Revised Amendment 2 
 

Rehab Bulkheads 1&2
Portsmouth, VA

08/28/08 Curtis Bowen:  Project Manager 
bowenc@tesorocorp.com
  
(757)-518-8491 Fax
(757)-518-8491 Phone
RFP
General Requirements
Wage Rates
Specifications
Drawings 
Site Visit Pictures
 

Homeporting Fast Response Cutters
Miami, FL

04/05/10 Vic Lopez:  Estimator
Vic.Lopez@TetraTechTesoro.com 
 (757) 518-8491 Ext. 224-  Phone
(757) 518-8417 - Fax
RFP
General Requirements & Bid Form
Wage Rates
Specifications
Drawings 

Reference Documents
07-01-84 Expansion & Rehabilitation
3405 Bulkhead Repairs
683815 Divesture of 4.16 KV Power System
M0444 Waterfront Repairs
M1169 Repair Fire Alarm System Specs
M1169 Repair Fire Alarm System Drawings
M1193 Portable Water Service & Details
M9914 Sewer Collection System Plan
T000 Telephone Shore Tie Outlet
Topographic Survey
Water Supply & Wastewater Disposal Manual
FRC Requirements Summary
Geotechnical Report

 
 01 02 03 04 05

Design & Construct an Armory Training Building
Galveston, TX

12/23/09 Vic Lopez:  Estimator
Vic.Lopez@TetraTechTesoro.com 
 (757) 518-8491 Ext. 224-  Phone
(757) 518-8417 - Fax
RFP
Genera Requirements & Bid Form
Wage Rates
Specifications
Drawings

Supplemental Documents
Geotechnical Report 2002
Geotechnical Report 2008
01
Revised 01

Home  Up