General Bids
 

Job Description

Date Awarded

Point of Contact

Drawings / Specs

Amendments

Langley Dormitory
LAFB
Virginia
07/24/07

David Freitas: Project Mgr.
freitasd@tesorocorp.com 
(757) -518-8589 Fax 
(757) -518-8491Phone

 

Specifications
Drawings  
Site Visit Pics


Redi-Check
Check List of Errors

Read Me
Architectural Drawings
Civil Drawings
Structural Drawings
Mechanical Drawings
Plumbing Drawings
Electrical Drawings
 
Volume 1 Specs (01008-13286)
Volume 2 Specs (13801-16815)
 
01 02


Steam Plant Area Decentralization &
Energy Conservation Measures
Norfolk, VA

 

04/20/10

Bruce Diggs:  Estimator
Bruce.Diggs@TetraTechTesoro.com
(757) 518-8491 Ext. 306-  Phone
(757) 518-8417 - Fax

Bid Bulletin 3-29-10

Solicitation
Wage Rate
General Requirements
Program Requirements
Design Guide Specs
Drawings
Soil Borings Report 

CD Attachments
ECM Feasibility Study
Building Pier 8
CEP-41
CEP-58
CEP-86
CEP-87
CEP-113
CEP-126
CEP-127
CEP-162
CEP-166
CEP-171
CEP-195
CEP-198
CEP-200
CEP-201
CEP-204
CEP-209
LF-59
LF-60
LP-21
LP-27
LP-48
N-24
Q-80
SP-9
SP-10
SP-12
SP-29
SP-45
SP-65
SP-69
SP-91
SP-123
SP-124
SP-132
SP-233
SP-236
SP-237
SP-254
SP-256
SP-257
SP-312
SP-313
SP-356
SP-362
SP-364
SP-366
SP-367
SP-372
SP-381
SP-383
V-29
V-47
V-48
V-50
V-52
V-53
V-61
V-88
V-146
V-147
W-135
Z-105 

Erosion & Sediment Control Instruction
Asbestos Report
Sequence of Operations & DDC Points List
Installation Appearance Plan


 
01

02

03

04 Map

05

06 - Please note item 21-Building V53 is not in the scope.

07

08

09 

10

11

12

Asbestos Report

13

14

15

16

17


Home  Up