Please Read the following information before Downloading any projects to Bid!
These are the Master Specifications for the Langley MACC Program.
All Projects are bound to these specifications and should be used in conjunction
with the project specifications,
whether or not the project has its own specifications.
If you have any
questions concerning this matter please
contact our office at 757-518-8491.
Master
Specifications - Langley MACC
Job Description |
Bid Date |
Point of Contact |
Drawings / Specs |
Amendments |
|
Repair Nor'easter Damage, Floors, Walls, Ceilings F664 |
07/20/10 |
Wes Norton: Estimator |
RFP SOW Wage Rate Specifications Material Schedule Floor Plan Site Visit Pictures Site Visit Pictures 2 |
01
02
03 Section 09622 04 Project Re-issued: 01 02 |
|
Repair Nor'easter Damage, Floors, Walls, Ceilings, Roof F658 |
06/11/10 |
Eddie Crank: Estimator |
RFP
Bid Form SOW Wage Rate Specifications Drawings Site Visit Pictures |
01
02
03 03 attachment 04 05 06 07 08 09 10 |
|
Repair Floors, Walls, and Ceilings & Repair HVAC Systems F621 |
05/27/10 |
Bruce Diggs: Estimator |
RFP SOW Wage Rate Specifications Drawings |
01 02 As-Builts 03 |
|
Repair King Street and Tabb Creek Bridges & Temporarily Relocate Tabb Creek Utilities, Facilities 404 & 1045 |
08/04/10 |
Vic Lopez: Estimator |
RFP
SOW Design Build SOW Wage Rate Specifications Site Visit Pictures Air Force Form General Provisions Drawings |
01 02 03 04 |
|
Repair Nor'easter Damage, Floors, Walls, Ceilings, Roof F617 |
07/14/10 |
Wes Norton: Estimator |
RFP SOW - Revised 06/17/10 Wage Rates Specifications Material Scehdule Floor Plan Site Visit Pictures |
01 02 |
|
Construct Upgraded Generator |
08/02/10 |
Wes Norton: Estimator |
RFP Revised Bid Form 7-8-10 SOW Wage Rates Specifications |
01 |
|
Repair Nor'easter Damage, Floors, Walls, Ceilings, Utilities F891 |
08/04/10 |
Wes Norton: Estimator |
RFP SOW Wage Rates Specifications Floor Plan Tie-Down Locations Schedule of Material Submittals Asbestos Survey |
|
|
Repair Nor'easter Damage, Floors, Walls, Ceilings, Utilities, and Roof F751 |
08/17/10 |
Wes Norton: Estimator |
RFP SOW Wage Rates Specification Room Schedule Floor Plan Site Location |